Structural modification

  • Load bearing wall removal
  • Detached garage
  • Deck and porch design and construction
  • Design of second units, legal basement
  • Finished basement design and construction
  • Design and construction of retaining walls
  • Site inspection and sign off reports
  • Underpinning design
  • Apply for building permit